Pottersburg Creek Remediation - Phase 2

London, Ontario


 

PRINCIPALS
City of London

Pottersburg Creek Reconstruction (Phase 2) continues the channel remediation works previously completed by the City of London upstream of Veterans Memorial Parkway.  Phase 2 includes the design and construction effort 1,100 m downstream from the Parkway to approximately 400 m west of Industrial Road.

The channel remediation provides for a floodway 50 m wide with a 9 m wide low flow channel meandering through the bottom of the floodway. The project calls for a significant natural landscaping component and tree planting strategy.

Some of the project objectives include enhanced stream morphology, improved erosion control, optimized flood storage, and recovery of lands previously designated as floodplain.